A full primary bath down to the studs — curbless walk-in shower, freestanding soaking tub, floating double vanity, and warm plaster walls.
- The brief
- A cramped builder-grade primary bath with a dated tub nobody used.
- What we did
- We reframed the wet wall for a curbless walk-in shower behind a curved plaster surround, laid a terrazzo pebble floor, and finished the room in warm terracotta tile and unlacquered brass.
- Timeline
- ~6 weeks
The original bath was a cramped builder-grade layout. We reframed the wet wall, added a curbless shower with a linear drain, and finished the room in hand- troweled plaster and unlacquered brass.


