Service
Bathroom Remodeling
$35K–$75K · 2–4 WEEKS DESIGN + 4–7 WEEKS CONSTRUCTION

Western Desert Construction remodels primary and guest bathrooms across Gilbert, Mesa, Chandler, Queen Creek, Scottsdale, Tempe, and Phoenix, with most primary bath remodels costing $35,000–$75,000. Construction typically takes 4–7 weeks after a 2–4 week design and selection phase.
Materials
Sample table

How much does a bathroom remodel cost in Chandler, Gilbert, and Mesa?
Primary bath remodels usually run $35K–$75K. Guest and hall baths often come in lower. The biggest cost drivers are converting a tub to a walk-in shower, moving plumbing, tile size and pattern, glass, and vanity grade.
How long does a bathroom remodel take?
Most primary baths take 4–7 weeks of construction. Waterproofing and tile need cure time between steps, and we do not rush those. They are what keep a shower dry for decades.
What happens if you find water damage behind the shower?
It is common in older Valley homes. We stop, photograph it, show you, and price the repair as a written change order before closing the wall. Damaged framing and valves get replaced, not covered up.
What's included
- —Design and tile layout
- —Demo to the studs
- —Plumbing and valve replacement
- —Full shower waterproofing system
- —Tile, glass, and vanity install
- —Lighting, exhaust fan, and paint
Questions
How much does a primary bathroom remodel cost?+
Most primary bath remodels we build cost $35,000–$75,000, depending on shower size, tile, glass, and whether plumbing moves.
Can you convert my tub to a walk-in shower?+
Yes. Tub-to-shower conversions are one of our most common bath projects, including curbless and low-curb designs.
What waterproofing do you use?+
We install a complete sheet-membrane or liquid-applied waterproofing system on every shower, flood-tested before tile goes on.
Can I use my other bathroom during the remodel?+
Yes. We schedule work so at least one bathroom stays usable, and we seal off the work area to control dust.
Do you handle aging-in-place features?+
Yes. Blocking for grab bars, curbless entries, comfort-height toilets, wider doors, and bench seating can all be planned into the design.
How long does a bathroom remodel take?+
Typically 4–7 weeks of construction after design and selections are complete.